Interior design budget template

Separate quantity, unit cost, and additional allowances before comparing an item with its budget. This workbook keeps those inputs visible instead of burying delivery and installation inside a single unexplained total.

Preview below, then download an editable copy. No sign-up required.

Worked example & fields

Illustrative teaching extension of The Window Room. Pending review; not a client record, supplier quote, site survey, or construction-ready document.

Interior design budget template · Worked Example sheet · USD teaching figures only
ReferenceItemQuantityUnitUnit costAdditional allowanceEstimated totalBudget allowanceRemaining / (over)Notes
F-01Linen two-seat sofa1item1200.00100.001300.001500.00200.00USD teaching figures only; no supplier quote or tax assumption.
F-02Oak reading chair1item500.0050.00550.00500.00-50.00USD teaching figures only; excludes installation.
FIN-02Warm mineral finishNot enteredNot enteredNot enteredNot enteredNot enteredNot enteredArea and rate unknown; do not read blank as free.

What each field records

Reference
Use the same item ID as the schedule.
Item
Describe the selection without treating it as an order.
Quantity
Use the quantity appropriate to the unit.
Unit
Keep items, modules, and area units distinct.
Unit cost
Enter a verified price or clearly identified allowance.
Additional allowance
Record combined additional amounts; explain what is included in the notes.
Estimated total
Quantity × unit cost + additional allowance. Calculated only when quantity and unit cost exist.
Budget allowance
Enter the comparison budget in the same currency.
Remaining / (over)
Budget allowance minus estimated total. Negative means over the entered allowance.
Notes
Record quote source, currency, exclusions, and date.

How to use this template

Choose one currency for the workbook and replace all illustrative figures with project-specific inputs. Enter additional costs as amounts, not assumed tax percentages. Blank quantities or prices leave the calculated total blank; zero is a deliberate numeric input. After adding or removing lines, verify formula ranges and report known totals alongside all unpriced scope.

  1. Set a currency and list the items in scope.
  2. Replace example rates with dated quotes or explicitly labeled allowances.
  3. Review negative variance and unresolved inputs before discussing a project total.

Read the known subtotal without losing the unknowns

The example has two priced teaching lines, totaling USD 1,850 against entered allowances of USD 2,000. The USD 150 remainder is the difference for those known inputs only. FIN-02 has no quantity or rate, so the workbook cannot establish a complete room budget.

Enter an allowance as an explicitly labeled assumption, not as a supplier quote. Keep quote date, currency, exclusions, and any included delivery or installation amounts in Notes. A blank additional allowance contributes zero to the calculation; it does not prove there are no additional costs.

When adding rows, extend formulas and the subtotal range as needed. Preserve calculated columns G and I; check a known line and an unresolved line after editing. The workbook is an editable planning aid, not an accounting system.

Illustrative teaching extension · No actual project decision or approval
LineInputs and calculated resultDecision supported
F-011 × USD 1,200 + USD 100 = USD 1,300; allowance USD 1,500.USD 200 remaining against this illustrative line allowance.
F-021 × USD 500 + USD 50 = USD 550; allowance USD 500.USD 50 over the illustrative line allowance.
FIN-02Quantity and rate blank; total unresolved.Obtain measured scope and pricing; do not call the line free.

Review before use

  • Do not add mixed currencies or unlike area units.
  • A blank line is unresolved, not a zero-cost item.
  • Do not treat the example total as a complete renovation budget.

Units, source information, and US use

US-first examples use USD teaching figures, not current market prices. Use one currency; keep tax, delivery, installation, and other cost assumptions explicit. Do not infer a tax rate from this example.

Make it your own

One workbook with Instructions, Blank Template, and Worked Example sheets. Twenty editable rows; duplicate or extend the template for your project.

Free download · No account · No information uploaded to OpenLintel

About this resource

Authored by OpenLintel with AI assistance. Examples are illustrative and have not received independent professional review. Adapt the structure to your practice and verify project-specific information. No legal agreement, regulatory compliance, or construction readiness is represented.

Authorship, review boundaries, sources, and corrections

See the information connect

Follow the corresponding chapter of The Window Room: one illustrative brief, one selected direction, and coordinated sample references.