Specify & coordinate / Downloads: XLSX / PDF

Residential plumbing fixture schedule template

Connect each residential fixture to its room, product evidence, related items and unresolved coordination checks.

Preview below, then download an editable copy. No sign-up required.

Worked example & fields

Original illustrative Powder Room Study, B-01. Independent of The Window Room; not a measured room, completed project or product specification. No manufacturer, model, supplier, approval or quote exists. Pending practitioner review.

Worked example preview · XLSX and PDF

Record 1

Fixture identity and product evidence

Fixture reference
PF-01
Room reference
B-01 - illustrative powder room
Fixture / design role
Handwash basin concept
Quantity
1
Unit
item; verify final set
Manufacturer
Not selected
Model / catalog number
Not selected
Finish / selection state
Light ceramic preference only; product unresolved
Product source
No product source or supplier quote

References, responsibility and review

Source checked date
Unresolved / not entered
Specification reference
SP-PF-01 - teaching placeholder; no cut sheet
Drawing / location reference
No measured layout or issued drawing
Related fixture / interface
PF-02 faucet; basin and faucet compatibility unresolved
Supply responsibility
Not assigned
Installation review owner
Not appointed
Review status
Proposed function only; no technical or purchasing approval
Open coordination checks
Confirm basin envelope, mounting, faucet-hole arrangement and waste connection with sourced product information and the appointed reviewer.
Revision / next action
R0; select candidate products and obtain data sheets.

Record 2

Fixture identity and product evidence

Fixture reference
PF-02
Room reference
B-01 - illustrative powder room
Fixture / design role
Basin faucet concept
Quantity
1
Unit
item; verify supplied components
Manufacturer
Not selected
Model / catalog number
Not selected
Finish / selection state
Brushed-metal preference only; finish code unresolved
Product source
No product source or supplier quote

References, responsibility and review

Source checked date
Unresolved / not entered
Specification reference
SP-PF-02 - teaching placeholder; no cut sheet
Drawing / location reference
No measured layout or issued drawing
Related fixture / interface
PF-01 basin; reach, clearance and mounting unresolved
Supply responsibility
Not assigned
Installation review owner
Not appointed
Review status
Proposed function only; no technical or purchasing approval
Open coordination checks
Obtain manufacturer dimensions, installation and service requirements; assign review of basin compatibility and project suitability.
Revision / next action
R0; compare sourced candidates before any selection approval.

What each field records

Fixture reference
Assign a stable fixture identifier shared by the schedule, specification and relevant drawing.
Room reference
Use the project room identifier consistently.
Fixture / design role
Identify the required function separately from an unselected product.
Quantity
Record the intended count; verify against the current layout.
Unit
State the counting or purchasing unit and check set or pack contents.
Manufacturer
Record only a verified manufacturer.
Model / catalog number
Use the exact model from a checked manufacturer or supplier source.
Finish / selection state
Distinguish a design preference from a verified product finish or final selection.
Product source
Link the actual product page, supplier record or data sheet and its revision.
Source checked date
Record the date the actual source was checked.
Specification reference
Link the project specification record and cut sheet when available.
Drawing / location reference
Link the relevant layout or elevation only if it exists.
Related fixture / interface
Identify related items whose compatibility still needs checking.
Supply responsibility
Name who supplies the item only after responsibility is agreed.
Installation review owner
Record the appointed professional responsible for the relevant installation review.
Review status
Keep proposed selection, technical review and purchasing approval distinct.
Open coordination checks
List missing dimensions, mounting, compatibility or service information without inventing specifications.
Revision / next action
Preserve the current revision and state the next information request.

How to use this template

Educational selection and coordination record, pending practitioner review. It does not calculate fixture demand, size services, establish code compliance or provide installation instructions. Keep product-source facts and project review separate. Use the blank record with the appointed project professionals before purchasing or installation.

  1. Assign stable room and fixture references.
  2. Record the intended function and count before identifying product evidence.
  3. Add exact manufacturer/model references only after checking an actual source.
  4. Connect related fixtures and record unanswered compatibility questions.
  5. Assign the appropriate review and supply responsibilities; update actual status and revision.

Review before use

  • A finish preference is not a verified product finish.
  • A placeholder specification reference is not an available cut sheet.
  • A coordinated-looking schedule does not prove technical suitability.
  • Design preference, installation review and purchasing approval are separate decisions.

Units, source information, and US use

Example counts are illustrative items, not confirmed purchasing quantities. No dimensions, flow rates, service sizes, prices or regulatory requirements are supplied. Preserve actual units and source dates when entering project information.

Make it your own

One workbook with Instructions, Blank Template and Worked Example sheets. Field/value blocks keep the fixture record readable. Duplicate Blank Template for additional fixtures; retain shared references. The PDF previews both original illustrative records.

Free download · No account · No information uploaded to OpenLintel

About this resource

Authored by OpenLintel with AI assistance. Examples are illustrative and have not received independent professional review. Adapt the structure to your practice and verify project-specific information. No legal agreement, regulatory compliance, or construction readiness is represented.

Authorship, review boundaries, sources, and corrections

References

Connect the review decisions

This independent Powder Room Study demonstrates unresolved fixture coordination. Use the approval-state guide to distinguish design preference, technical review and purchasing authority.

Review the approval states

Discuss your studio’s workflow

Discovery requests are not open yet. Check current availability and what a future conversation could cover. Every resource remains available without signing up.

Check discovery availability